|
|
The maintenance of the track, subjected to heavy operational constraints (nightshift work, reduced delays, sometimes extreme weather conditions), demands the rapid setting to work of a range of specialised tools that optimize and make the works safe. |
|
Road/Rail Vehicle fitted with a lifting basket for the staff, designed for the inspection of the tunnels and the catenary. On/off tracking through the telescopic beams.
|
|