SOCOFER - Constructeur ferroviaire

Inspection & Maintenance > Road-Rail >
Fast Intervention RR-IRC 12-1

The maintenance of the track, subjected to heavy operational constraints (nightshift work, reduced delays, sometimes extreme weather conditions), demands the rapid setting to work of a range of specialised tools that optimize and make the works safe.

A Road/Rail Vehicle fitted with a loading platform with a lifting end board, generator set, winch.

On/off tracking through the telescopic beams

  • Weight: 12 t
  • Power of the lorry: 135 kW
  • Loading capacity: 2,5 t
  • Loading surface : 6,5 m2
  • Max. speed on track: 25 km/h

Close window